14.3 The solution to one-unit, one-period logging and road management problem was: Minimum cost: $108,500 Ground-based logging into landing L2 Build landing L2 Build road Y4 Transport timber volume over road Y4 By performing some sensitivity analysis on the value of X2 (cell C6) in spreadsheet 14-3.xls, you will find that when X2 reaches a value of $50.34 per CCF, the solution will change, indicating landing L1 should be built, along with road Y3, over which the volume will be transported. This spreasheet was designed to use Solver as the LP algorithm. To run Solver, select TOOLS, then select SOLVER, then press SOLVE. Here's a little manual binary search process to illustrate. The cost for cable logging will be $116,500 (try these calculations yourself), so any ground-based cost over $116,500 may indicate that the cable logging system is more appropriate from a cost perspective. The question asked for the specific point (ground-based logging cost) where the decision will occur. Ground-based logging cost per CCF Total cost Decision 50.00 116,000 ground-based 55.00 123,500 cable 52.50 119,750 cable 51.00 117,500 cable 50.50 116,750 cable 50.25 116,375 ground-based 50.33 116,495 ground-based 50.34 116,510 cable Therefore, a $50.34 ground-based cost will make cable system seem more attractive from a cost perspective.